• Prendere il treno contando sui servizi di un aeroporto

    Accesso veloce, parcheggio facile e un moderno terminal a tua disposizione

  • Prendere il treno contando sui servizi di un aeroporto

    Accesso veloce, parcheggio facile e un moderno terminal a tua disposizione

At Trieste Airport, every day:

  • frecce

    6 high-speed Frecce trains

    on the route Trieste – Venezia Mestre

  • interreg

    20 interregional trains

    on the route Trieste – Udine

    28 interregional trains

    on the route Trieste – Venezia

  • micotra

    MICOTRA train

    on the route Trieste – Udine – Villach

Trieste Airport:

  • Trains

    Every day 6 high-speed and 48 interregional trains, in addition to the MICOTRA train to and from Villach and 2 daily train connections to and from Ljubljana operated by Trenitalia and Slovenske Zelenice.

  • Car parks

    Long-term and short-term car parks for every need.

  • Bus

    Direct connections to all the main cities of Friuli and international destinations with Flixbus and Florentiabus.

  • Airport

    Our direct scheduled flights.

Ripavimentazioni sulla A4: chiusure svincoli Redipuglia dal 25 al 28 settembre

Autostrade Alto Adriatico S.p.A. ha programmato degli interventi nel fine settimana dal 25 al 28 settembre lungo la A4, che interesseranno il casello di Redipuglia:

-tra le ore 20:00 di venerdì 25 e le ore 06:00 di lunedì 28 avverrà la chiusura dell’uscita di Redipuglia per chi proviene da Trieste. Pertanto, chi proviene da Trieste ed è diretto a Trieste Airport potrà uscire a Monfalcone Est.

- tra le ore 21:00 di venerdì 25 e le ore 06:00 di sabato 26 e tra le ore 21:00 di sabato 26 e le ore 06:00 di domenica 27 verrà chiuso l’ingresso al casello di Redipuglia in direzione Venezia. Pertamnto chi da Trieste Airport si dirigerà verso Udine/Venezia potrà immettersi sulla A4 allo svincolo di Villesse.

Maggiori info: autostradealtoadriatico.it